BEPCII/BESIII Upgrade and the Prospective Physics
arXiv:physics/0605158
Abstract
The Status of BEPCII/BESIII upgrade is described, BEPCII is designed to reach a luminosity of $10^{33}/cm^{-2}s^{-1}$ at c. m. energy of 3.89GeV, and BESIII detector is fully rebuilt. The project is on track and is progressing well. The machine and detector are expected to commission together at the late half of 2007, and start to take some engineer run end of 2007 or beginning of 2008.
5 pages, 2 figures, Flavor Physics and CP Violation Confeerence, Vancouver, 2006