NewEvery arXiv paper, its researchers & institutions — mapped.
paper

First results of the new endcap TOF commissioning at BESIII

arXiv:1605.01780 · doi:10.1088/1748-0221/11/07/C07005

Abstract

The upgrade of the current BESIII Endcap TOF (ETOF) is carried out with the Multi-gap Resistive Plate Chamber (MRPC) technology. The installation of the new ETOF has been finished in October 2015. The first results of the MRPCs commissioning at BESIII are reported in this paper.

7 pages,8 figures,conference